Fort Hunter Liggett, CA — U.S. Army Corps of Engineers — 1.12mW
Project Description
The Solar Power Integrators team provided a custom design and installed elevated solar arrays that spanned between two existing elevated parking arrays. - July 2015
Topeka, KS — Veterans Affairs Medical Center — 857kW
Project Description
Solar Power Integrators designed and installed a fixed ground mount system for the Topeka, Kansas Veterans Administration Medical Center. – May 2015
Grand Junction, CO — Veterans Affairs Medical Center — 904kW
Project Description
Solar Power Integrators designed and installed elevated parking and roof arrays. The installation is the largest solar installation for that area of Colorado. Solar Power Integrators was able to utilize much of the local labor force for construction- November 2014
McClellan, CA — Veterans Affairs Outpatient Medical Center — 522kW
Project Description
Solar Power Integrators designed and installed elevated parking arrays to integrate with existing roof and parking arrays at the McClellan, California Veterans Affairs Outpatient Center. – February 2014
Cheyenne, WY — Veterans Affairs Medical Center — 234kW
Project Description
Solar Power Integrators designed and installed solar parking arrays at the Cheyenne, Wyoming Veterans Affairs Medical Center. Included in the project was the replacement of a “green transformer” for the facility. Construction was completed on time regardless of harsh winter conditions that included snow and wind. – March 2013
San Diego, CA — Veteran Affairs Medical Center — 207kW
Project Description
Solar Power Integrators designed and installed a solar roof array for the San Diego Veterans Affairs Medical Center in San Diego, California. The roof top array is on top of a 16 story medical center. The SPINT team worked around other VA roof and HVAC projects and customer schedule needs in getting the project installed. – May 2013
Fresno, CA — Veteran Affairs Medical Center — 181kW
Project Description
Solar Power Integrators designed and installed four different roof mount solar installations for the Fresno Veteran Affairs Medical Center. The team worked around multiple VA projects including new roof and new construction to complete the installation. – September 2012
Lee Vining, CA — Mono Lake Visitor Center — 32kW
Project Description
Solar Power Integrators designed and installed an elevated solar array for the U.S. Department of Agriculture – Forestry Dept. - Mono Lake Visitor Center. The solar array had to withstand heavy Sierra snow and wind loads that are prevalent in the area during the winter. - August 2012
Carbondale, IL — Senator Paul Simon Federal Building — 100kW
Project Description
Solar Power Integrators designed and installed a solar roof installation that included a new “cool” roof replacement at the Senator Paul Simon Federal Building in Carbondale, Illinois – September 2010
Ventura County, CA — GSA County Administrative Buildings — 500kW
Project Description
Solar Power Integrators developed, designed, installed and coordinated a Purchase Power Agreement for solar roof top for several buildings, at the GSA County Administrative Buildings in Ventura County, California – June 2009
Honolulu, HI — USS Arizona Memorial Visitor Center — 50kW DC
Project Description
Solar Power Integrators provided a turnkey design-build construction of a 50kW DC on the roof of the USS Arizona Memorial Visitor Center in Honolulu, HI. The site is a high-profile location, and the photovoltaic installation had to be wind-rated for tropical weather conditions. – December 2010
Kansas City, MO — Veterans Affairs Medical Center — 1.79mW
Project Description
Solar Power Integrators designed and installed Solar Parking Arrays and Roof Top arrays. Parking arrays were on multiple levels of ground area surrounding the medical center. Kansas City, Missouri – Complete September 2015
Brooklyn, NY — Veterans Affairs Medical Center — 73.9 kW
Project Description
Solar Power Integrators designed and installed a Roof Mount system to withstand winter’s harsh snow and wind conditions. Brooklyn, NY – Complete September 2015
Columbia, SC — Veterans Affairs Medical Center — 1.23 mW
Project Description
Wm. Jennings Bryan Dorn Veterans Affairs Medical Center– Columbia, SC – Currently in Design
1.23 mW Elevated Parking Arrays
Solar Power Integrators Design Build
Scheduled Construction Fall-Winter 2015
Northport, NY — Veterans Affairs Medical Center — 1.3 mW
Project Description
Veterans Affairs Medical Center– Currently Under Construction
1.3 mW Elevated Parking Array
Solar Power Integrators Design Build
Pt. Reyes, CA — National Park Service — Approximately 25 kW
Project Description
Point Reyes National Seashore, Northern California – 5 Individual Sites in Design
Design Build Roof Mount Systems
4 On Grid – 1 Off Grid – Approximately 25 kW
Due to be in Construction Fall 2015
Pt. Reyes, CA — National Park Service — 73.9 kW
Project Description
Pt. Reyes National Seashore, Northern California-National Park Service
Design and installation of 10.2 KW Solar Roof Arrays, Electrical and Monitoring for administrative offices/residences. Services included interconnection application with the
utility – Completed May 2014
Alturas, CA — Modoc National Wildlife Refuge — 13.2 kW
Project Description
U.S. Department of Fish & Game – Single Axis Tracker
Solar Power Integrators was contracted by the Dept. of Fish and Game for design, product, AC electrical installation, monitoring and installation overview for a 13.2 single axis tracker to produce energy for the Modoc Natural Wildlife Refuge. The project, the first of its kind for the Dept. of Fish and Game is part of the Agency’s strategy to reduce its utility expenses by utilizing renewable energy. - Completed August 2011
Jackson, MS — Veterans Affairs Medical Center — 2.6 mW
Project Description
Solar Power Integrators provided design build for 2.6 megawatts of solar parking array for the (Sonny) Montgomery VA Medical Center located in Jackson, MS. The unique design included continuous solar with a minimized wind load for ground level parking areas and for the top of a multi-level parking garage. - Completed September 2015